National Repository of Grey Literature 2 records found  Search took 0.01 seconds. 
Optimalization of the welding process for low - pressure tubular sets
Urbánek, Štěpán ; Kubíček, Jaroslav (referee) ; Sigmund, Marian (advisor)
The diploma thesis examines the implementation of the production process of low-pressure pipe sets for hydraulic aggregates in the company Bosch Rexroth. The first part presents a literature analysis of used technologies and basic welded materials. The second part focuses on selected subprocesses ensuring the production and proposals for their streamlining. It includes a summary of responsibilities across departments and a template for processing the necessary technical documentation for the smooth running of production. Another proposal includes a technological procedure for practical verification of the production, which simultaneously serves as a basis for measuring the welding time. The reason for the implementation of this production was the extended delivery time of pipe sets from suppliers and possible financial savings. The practical part is concluded with a technical and economical evaluation, which expresses the possible financial savings in the production of low-pressure pipelines instead of the current state involving the cooperation with suppliers.
Optimalization of the welding process for low - pressure tubular sets
Urbánek, Štěpán ; Kubíček, Jaroslav (referee) ; Sigmund, Marian (advisor)
The diploma thesis examines the implementation of the production process of low-pressure pipe sets for hydraulic aggregates in the company Bosch Rexroth. The first part presents a literature analysis of used technologies and basic welded materials. The second part focuses on selected subprocesses ensuring the production and proposals for their streamlining. It includes a summary of responsibilities across departments and a template for processing the necessary technical documentation for the smooth running of production. Another proposal includes a technological procedure for practical verification of the production, which simultaneously serves as a basis for measuring the welding time. The reason for the implementation of this production was the extended delivery time of pipe sets from suppliers and possible financial savings. The practical part is concluded with a technical and economical evaluation, which expresses the possible financial savings in the production of low-pressure pipelines instead of the current state involving the cooperation with suppliers.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.